Aoyama Plateau Wind Farm

Large wind farm in Japan
Aoyama Plateau Wind Farm

The Aoyama Plateau Wind Farm (青山高原ウインドファーム, Aoyama kōgen uindofāmu) is the largest wind farm in Japan. It has a total capacity of 95 MW, and is located in the Aoyama Plateau, Muroo-Akame-Aoyama Quasi-National Park.

The wind farm was built in stages. The first phase consisted of 20 750 kW turbines manufactured by JFE Engineering, commissioned in 2003. These turbines have a rotor diameter of 50.5 m and a tower height of 50 m. This original site covers 10.5 hectares and produced a maximum of 15 MW. The second phase was commissioned between 2016 and 2017 and comprises an additional 40 larger 2 MW turbines with a rotor diameter of 65.4 m and a tower height of 80 m, manufactured by Hitachi.

See also

  • flagJapan portal
  • iconWeather portal
  • iconRenewable energy portal

References

  • NKK to Play Key Role in Wind Power Generation Project in Mie Prefecture

External links

  • Official website (in Japanese)
  • v
  • t
  • e
Wind power
Wind power
Wind farms
Wind turbines
Wind power industry
Manufacturers
Concepts
  • icon Wind power portal
  • Category
  • Commons
  • Additional portals:
  • Renewable energy
  • Energy

34°42′40″N 136°17′34″E / 34.711058°N 136.292694°E / 34.711058; 136.292694


Stub icon

This article about a wind farm is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e

This article about a Japanese power station is a stub. You can help Wikipedia by expanding it.

  • v
  • t
  • e