Expressway S69 (Poland)
Former expressway in Poland, that connected Bielsko-Biała with Poland–Slovakia border
Expressway S69 | |
---|---|
Droga ekspresowa S69 | |
Route information | |
Status | Became a portion of Expressway S1 |
Existed | 2001–4 August 2016 |
Major junctions | |
From | S 1 near Bielsko-Biała |
Major intersections |
|
To | Slovakian border at Zwardoń |
Location | |
Country | Poland |
Major cities | Bielsko-Biała |
Highway system | |
|
Expressway S69 or express road S69 (in Polish droga ekspresowa S69) was a major road in Poland which was supposed to run from Bielsko-Biała to the border with Slovakia at Zwardoń/Skalité, where it would connect with Slovak motorway D3. In the original plans, from Bielsko-Biała to Żywiec, the road was to be a dual carriageway with the remaining part to the border with Slovakia a single carriageway only (with terrain reserves for construction of second carriageway in future).
On 4 August 2016, the S69 became part of Expressway S1[1] when it was rerouted; the old route of S1 became Expressway S52.
Route description
Number of exit(facility) | Name | Mialeage from beginning | History of construction | Notes |
---|---|---|---|---|
1) | Bielsko-Biała-Komorowice | 0 km | Works from here to Suchy Potok interchange were allowed in May 2009 | To Suchy Potok interchange concurrency with , western terminus |
2) | Bielsko-Biała-Rosty | 2.9 km (1.80 mi) | ||
3) | Suchy Potok(planned) | 4.5 km (2.80 mi) | Contract was signed in October 2008 to the Bielsko-Biała-Mikuszowice-II interchange | planned have an interchange here |
4) | Bielsko-Biała-Lipnik | 6.8 km (4.23 mi) | ||
5) | Bielsko-Biała-Mikuszowice-I | 10.8 km (6.71 mi) | ||
6) | Bielsko-Biała-Mikuszowice-II | 11.5 km (7.15 mi) | ||
7) | No name | 14.2 km (8.82 mi) | From here to Żywiec interchange: first contract signed in 2010, which was cancelled two years later, and signed with other company in July 2014. Done in July 2015. | |
8) | No name (Rybarzowice) | 17.7 km (11.00 mi) | ||
9) | No name(Kalki) | 21 km (13.05 mi) | ||
10) | Żywiec | 26.5 km (16.47 mi) | From here to Przybędza interchange: signed in June 2005, done by November 2006 | |
11) | Browar | 29.2 km (18.14 mi) | ||
12) | Przybędza | 33.9 km (21.06 mi) | Section to be completed in August 2023 | |
13) | Milówka | 42.14 km (26.18 mi) | ||
14) | Kasperka | 46.84 km (29.11 mi) | No exit of eastbound traffic on the road | |
15) | Laliki | 49.54 km (30.78 mi) | Last interchange before border | |
Zwardoń | 53.34 km (33.14 mi) | Entrance to Slovakia |
- v
- t
- e
- A1
- A2
- A4
- A6
- A8
- A18
- A50
- S1
- S2
- S3
- S5
- S6
- S7
- S8
- S10
- S11
- S12
- S14
- S16
- S17
- S19
- S22
- S50
- S51
- S52
- S61
- S74
- S79
- S86
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- 22
- 23
- 24
- 25
- 26
- 27
- 28
- 29
- 30
- 31
- 32
- 33
- 34
- 35
- 36
- 37
- 38
- 39
- 40
- 41
- 42
- 43
- 44
- 45
- 46
- 47
- 48
- 49
- 50
- 51
- 52
- 53
- 54
- 55
- 56
- 57
- 58
- 59
- 60
- 61
- 62
- 63
- 64
- 65
- 66
- 67
- 68
- 70
- 71
- 72
- 73
- 74
- 75
- 76
- 77
- 78
- 79
- 80
- 81
- 82
- 83
- 84
- 85
- 86
- 87
- 88
- 89
- 90
- 91
- 92
- 93
- 94
- 95
- 96
- 97
- A3
- A12
- A41
- S47
- S69
- 69
- 98
References
- ^ Rozporządzenie Rady Ministrów z dnia 19 maja 2016 r. zmieniające rozporządzenie w sprawie sieci autostrad i dróg ekspresowych (Polish)
This Polish road or road transport-related article is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e